Most property insurance policies contain sections titled something like
"Additional Coverages" and "Coverage Extensions." While the
words "additions" and "extensions" suggest that the policy
is broadened, it does not necessarily mean that the coverage and/or limit
satisfies the insured organization's coverage needs based on actual loss
exposures. If one plays devil's advocate, then any reference to a coverage
addition or extension in a property insurance policy should be seen first as a
possible coverage limitation until the loss exposure is reviewed and
understood. Said differently, some coverage in an insurance policy is just
that—"some coverage"—it does not mean the coverage provided is what
the insured organization needs. Relying on standard policy additions and
extensions of coverage without an understanding of loss exposure may result in
an underinsured loss to the insured organization and thereby create a scenario
for a possible malpractice claim against the insurance agent or broker.
Ignorance is not bliss, and misfortune suffered by one party can become
expensive misfortune to all parties involved in an insurance policy.
Coverage disputes between risk manager and insurer, agent, or broker are not
always about ambiguity of policy language. Many disputes stem from a lack of
understanding of coverage detail and unsatisfied coverage expectations. The
devil is in the details; one must understand coverage limitations prior to
loss. While one insurance policy may be better written than another is, the
best insurance policy is the one that covers the loss as expected by the
insured organization.
Risk treatment for any loss exposure (i.e., first party or third party) must
begin with exposure identification, no matter if insurance or other
technique(s) will be used (i.e., contractual risk transfer, pre/post-loss
control, segregation of exposure, etc.). The identification process should rely
on many different tools including use of exposure surveys/questionnaires,
insurance applications, walking around the insured organization asking
"what if" questions. Even reading an insurance policy (property,
builders risk, crime, general liability, etc.) is a way to understand what
risks of loss may occur to the insured organization and where coverage issues
may exist for an uninsured or underinsured event.
Many property insurers follow policies filed by Insurance Services Office,
Inc. (ISO), in their entirety or closely but may file their own form with
significant deviations. These independently filed policies may be broader than
ISO's in certain areas, and significant coverage differences may be found
when comparing one insurer's policy form to that of another insurer's
policy form; one policy may be superior to that used by another insurer in its
ability to cover a specific property loss exposure. What does this mean to the
risk management professional? While several different property insurers may be
seen as equal in terms of financial stability, quality of service, and cost,
the coverage each provides may be unequal in the way one policy addresses a
given loss exposure: one may provide sufficient coverage, while the other may
not, even though both may be thought of as having broad coverage terms.
Particularly Troublesome Additions and Extensions
To discuss "additions" and "extensions" of coverage
issues, we will use ISO building and personal property coverage form CP 00 10
06 07 to set our baseline. While the ISO form has many "additions"
and "extensions," we address only those that seem to pose a truly
catastrophic loss exposure.
Debris Removal
Coverage is for expense to remove debris of covered property damaged or
destroyed by covered cause of loss from insured premises. The limit is 25
percent of the sum of the deductible plus the amount of direct damage loss paid
plus a possible additional $10,000 if the 25 percent limit is not sufficient.
Debris removal must be within 180 days of the loss.
In addition to physical damage caused by an insured peril, there may be
significant costs incurred to remove debris. Debris removal will likely
increase in proportion to the size of the loss. Hazardous material debris
(i.e., asbestos) will further increase the overall expense related to debris
removal. The organization may be liable for land and water pollution as a
result of hazardous materials released by the loss event (i.e., fire). There is
no guideline or touchstone available that a risk manager can use to estimate
the debris removal exposure.
ISO policies consider debris removal expense to be insured to the extent
that (1) the debris is of covered property, (2) it is caused by an insured
peril, and (3) the expense is not for extraction of pollutants from land or
water or to remove, restore, or replace polluted land or water. (These expenses
are addressed by the
pollutant cleanup and removal additional coverage.) The coverage limit for
debris removal is part of and not in addition to the overall limit for covered
property. In an ISO policy, the coverage is subject to a sublimit of 25 percent
of the sum of the deductible plus the amount paid by the insurer for direct
physical loss. ISO provides an additional $10,000 for debris removal expense
should the coverage limit be insufficient due to the overall property damage
limit or the 25 percent sublimit. ISO endorsement "Debris Removal
Additional Insurance" CP 04 15 10 00 provides a means for an insurer to
increase the $10,000 limit to another amount.
Non-ISO policies treat debris removal in a manner similar to ISO in that the
coverage is part of the property limit but may allow a greater sublimit within
the overall direct damage limit such as "... the greater of 25% of the
amount of physical damage payable ... or $5,000,000."
A catastrophic loss may use a substantial portion or the entire direct
damage limit, leaving an insufficient amount for debris removal expense. It is
important to consider the cost of debris removal when establishing a direct
damage limit at any one location. Debris removal cost drivers include but are
not limited to age of the building, proximity to other buildings (i.e.,
maneuverability of equipment), type of structure (wood frame or steel frame;
steel will be more expensive to cut, clear, and remove), and existence and type
of hazardous materials.
There is no benchmark that can be used to estimate the pre-loss cost of
debris removal. A risk manager could request a cost estimate from a local
demolition/debris removal contractor based on an assumption of a total loss.
This cost can be trended each year much like trended replacement cost values.
An increase in coverage sublimit and overall location limit can be requested as
deemed appropriate by the risk management professional.
Pollutant Cleanup and Removal
What is pollution in a property policy? ISO defines "pollutants"
in its policy form as "any solid, liquid, gaseous or thermal irritant or
contaminant, including smoke, vapor, soot, fumes, acids, alkalis, chemicals,
and waste ... (materials to be recycled, reconditioned or reclaimed)."
This definition is a key to understanding direct damage and business
interruption coverage that may be provided, albeit limited, in the ISO property
policy form.
Are there any coverage restrictions since direct damage has resulted in
release of pollutants? Coverage is excluded unless the discharge, dispersal,
migration, release, or escape is from a "specified cause of loss."
This means that the Causes of Loss-Special Form will have limitations, as
"specified cause of loss" is defined to mean the following named
perils: fire; lightning; explosion; windstorm or hail; smoke; aircraft or
vehicles; riot or civil commotion; vandalism; leakage from fire-extinguishing
equipment; sinkhole collapse; volcanic action; falling objects; weight of snow,
ice, or sleet; and water damage. What perils are not "specified" and
therefore not covered? Uninsured perils include events such as accidental
spills from manufacturing error or seepage from a corroded pipe.
ISO-filed policies provide a limit of $10,000 for expenses to extract
pollutants from land or water at the scheduled location if the release of
pollutants is from a specified covered peril as defined above, such as fire and
windstorm. The catastrophic nature of pollutants may result in land and water
extraction costs far greater than those insured in an ISO property policy. An
increased pollutant extraction limit should be considered based on exposure,
although it is uncertain as to what limits an insurer may provide. It is always
better to request an increased limit from the insurer than to assume that none
is available. Stand-alone direct damage and business interruption pollution
coverage may be available from specialty pollution insurers.
Increased Cost of Construction
Enforcement of building laws after a property loss event may result in
perils and costs not otherwise insured by the direct damage portion of a
property insurance policy. Such laws may require the condemnation and
demolition of the remaining physical structure. Unless properly endorsed, the
condemnation and demolition exposures are not insured in the ISO policy form or
in many independently filed policies. These exposures must be separately
insured by endorsement such as ISO endorsement CP 04 05 04 02.
But the basic ISO property policy, CP 00 10 06 07, provides some coverage
for increased costs of construction ("ICC") as long as the building
coverage is on a replacement cost basis. Coverage applies to increased costs
required by enforcement of ordinance or law to meet current building codes. The
limit for the ICC in the base form is the lesser of $10,000 or 5 percent of the
direct damage insurance that applies to the damaged building. This limit is
likely not sufficient if the building is large, old, and in need of mandatory
upgrades in electric service, plumbing, and ingress and egress.
It is important that the ICC exposure is reviewed along with the exposures
for condemnation (coverage for the remaining structure that is not damaged by
insured peril) and demolition (cost to demolish the condemned structure). Most
insured organizations will need coverage as provided by ISO endorsement CP 04
05 04 02 or its equivalent and should not rely on the low limit of coverage
provided for ICC in policy form CP 00 10 0607. Relying strictly on the limited
ICC coverage provided in this policy form may leave the insured organization
vastly underinsured for significant costs related to condemnation and
demolition.
Newly Acquired or Constructed Property and Property Off-Premises
Property insurance is typically provided on a scheduled location basis
either through a schedule included in the policy form or by reference and
reliance on a statement of values provided by the insured organization to the
insurer. There may be occasions in which property exposures arise that are not
shown as locations on a policy schedule or submitted statement of property
values. The risk management professional must understand the limitations of
coverage when the location and covered property are not listed in a schedule or
currently included in the statement of property values.
Organizations expand to new locations and add personal property as part of
their natural evolution. Additions in building exposures can occur by purchase
of an existing structure or construction of a new one. Personal property may
increase at a location scheduled in the policy, at a newly constructed
location, or at a location where the personal property purchase is made pending
shipment to a location scheduled in the policy.
In the ISO policy, the newly acquired/constructed coverage is temporary as
it exists for a finite period no greater than policy expiration or 30 days.
Coverage during this temporary period is limited to $250,000 per newly acquired
or constructed building and $100,000 for personal property at each of these
same covered buildings. The risk manager must have a process to ensure proper
internal reporting of all newly acquired or constructed property (buildings or
personal property) to him or her. Proper identification of all property
exposures is necessary to make proper changes to scheduled insured locations,
update the statement of value for reporting to the insurer, and track values in
relation to policy limits—sublimits or otherwise.
It is important to understand how coverage applies to personal property that
is at a location that is not scheduled or insured under the newly
acquired/constructed property coverage. What events may lead to personal
property being at other than a scheduled location? There are several reasons:
property left offsite for repair, work on goods in process in the custody of a
manufacturing subcontractor, or property in a public warehouse.
The ISO property off-premises extension of coverage is limited in many
ways.
- The location cannot be a scheduled location in the policy, nor covered
under "newly acquired/constructed" coverage grant.
- Coverage is subject to a limit of $10,000 per occurrence.
- The temporary location must not be owned, leased, or operated by the
insured organization, except that coverage does apply to property at a leased
storage location if the lease was executed after the beginning of the current
policy term.
- Personal property is covered while at a fair, trade show, or exhibition,
but no coverage applies to property in or on a vehicle.
- No coverage applies to property in the custody of salespersons unless the
property is at a fair, trade show, or exhibition.
Risk management due diligence is necessary for all personal property,
especially that which may be off premises at an unscheduled location. It is
essential that all ongoing locations are known to the risk manager so the
policy form and statement of values can be amended correctly to address the
exposure created by each location, scheduled or not, and at a limit sufficient
for the expected exposure.
Conclusion
The risk management professional must understand the direct damage loss
exposures contemplated by additions and extensions of a property
insurance policy to determine whether the coverage is reasonable for expected
loss. Adequacy of insurance coverage can only be achieved if both exposure to
loss and policy coverage are compared and understood and revisions are sought
as needed. The quality of any insurance policy is measured at time of loss
settlement.