Skip Navigation Links.
Collapse IRMI OnlineIRMI Online
Expand How To Use IRMI OnlineHow To Use IRMI Online
My Paid Publications
Expand What's NewWhat's New
Expand DashboardsDashboards
Collapse Commercial Liability InformationCommercial Liability Information
Collapse Free Commercial Liability CommentaryFree Commercial Liability Commentary
Expand Additional Insured IssuesAdditional Insured Issues
Collapse EnvironmentalEnvironmental
Asbestos Damages Excluded under Property Policy (January 2012)
Insuring Completed Operations Pollution Risks (January 2012)
Emergency Response Costs in Pollution Liability Policies (August 2011)
Judgment Day Comes in Global Warming Litigation (February 2011)
Green Building Projects and Environmental Risk (January 2010)
No CGL Coverage for Chimney Repairs Due to Carbon Monoxide Leakage (January 2011)
CGL Pollution Exclusion Applies to Dust and Diesel Fumes (December 2010)
In a Year of Skepticism, Global Warming Is Still a Timely Topic (November 2010)
Mold from a Covered Concurrent Cause Still Excluded (November 2010)
Pollution Exclusion Found Inapplicable (May 2010)
An Update on Chinese Drywall Claims (April 2010)
CGL Policy Held To Cover Oil Spill Cleanup Costs (April 2010)
Mold Damage to Contractor's Nondefective Work Caused by Subcontractor May Be Covered under Prime Contractor's Umbrella Policy (January 2010)
CGL Pollution Exclusion Bars Coverage for Injury from Carbon Monoxide Released from Heater (December 2009)
Insurer and Environmental Consultant Have No Duty To Warn of Mold (July 2009)
No Coverage in Homeowner's Policy for Mold Damage from Water Pipe Leak (May 2009)
Construction Debris Is Excluded Pollutant (February 2009)
Pollution Legal Liability Market Update (July 2008)
"Damages" under a 1973 CGL Insurance Policy (April 2008)
"Suits" under a 1973 CGL Insurance Policy (February 2008)
Common Law Exceptions to the 1973 "Owned Property" Exclusion (January 2008)
Epoxy Fumes Excluded by CGL Insurance (November 2007)
Contractors Pollution Liability Update (October 2007)
Allocating Losses under a 1973 CGL (September 2007)
Pollution Exclusion Bars Coverage for Damage Caused by Dirt and Rocks (March 2007)
Pollution Exclusions in CGL Policy Bars Coverage for Carbon Monoxide Poisoning (February 2007)
Naturally Occurring Hazards: They Can Be "Hazardous" to Your Contractors Pollution Liability Coverage (January 2007)
Mold Is Not Covered as an Ensuing Loss of Leaking Water (January 2007)
Promoting Insurance-Based Solutions to Brownfield Redevelopment Challenges (November 2006)
Financing Environmental Loss with Environmental Insurance (October 2006)
Premium Instead of Prayer Needed for Mold Coverage (July 2006)
Mold Litigation: Expert Testimony Required to Prove Causation (April 2006)
Subrogation and Intervention in Construction Defect Case Involving Water and Mold (February 2006)
Environmental Insurance Helps Create Sustainable Development Out of "Brownfields" (December 2005)
Absolute Pollution Exclusion in Contractors Policy Does Not Bar Coverage for Toxic Fume Injuries (November 2005)
Manganism? (October 2005)
Environmental Insurance as a FASB Fix (August 2005)
Silica Claim Barred by Total Pollution Exclusion in CGL Policy (August 2005)
Broad Pollution Exclusion Is Ambiguous: Lead Covered by Policy (May 2005)
Silica—The Next Environmental Issue (April 2005)
Whether Mold Cleanup Costs Are Covered Depends on Causation (April 2005)
Homeowners Policy Unambiguously Excluded Coverage for Mold (October 2004)
Environmental Liability Buyouts: A Developing Option (August 2004)
Development of Environmental Risk Profiles for Construction Firms (July 2004)
Managing the Environmental Risk from Subcontractors (May 2004)
Seven Tips on Mold Management Programs (November 2003)
Environmental Due Diligence: The Information Is Everywhere! (May 2003)
The New Reality of Risk: Environmental Toxic Torts (May 2003)
Insured Fixed-Price Contracts and Environmental Cleanup (April 2003)
Managing Environmental Liabilities through Contracts (January 2003)
Environmental Insurance Changes the Game for Commercial Lenders (December 2002)
Environmental Risk in Retail: Exposures and Solutions (October 2002)
The Environmental Risks of Residential Construction (October 2002)
A Mold Prevention Program (July 2002)
Navigating the U.S. Environmental Liability Market (Part 2) (March 2002)
Navigating the U.S. Environmental Liability Market (Part 1) (March 2002)
The Pitfalls of Accepting Contaminated Fill (March 2002)
Mold: The Newest Environmental Hazard (September 2001)
Conducting Proper Environment Risk Assessments (July 2001)
Introduction to ISO 14001 (April 2001)
Brownfield Redevelopment: A Risk versus Reward Proposition (December 2000)
Colleges and Universities: Changing Your "School of Thought" When It Comes to Environmental Liability (October 2000)
Lenders and Environmental Liability (September 2000)
There's a Fungus Among Us (June 2000)
The U.S. Environmental Liability Insurance Market (May 2000)
Hidden Environmental Exposures of the Construction Industry (March 2000)
Expand Liability InsuranceLiability Insurance
Expand Commercial Property InformationCommercial Property Information
Expand Commercial Auto InformationCommercial Auto Information
Expand D&O, PL, E&O, EPLI InformationD&O, PL, E&O, EPLI Information
Expand Workers Compensation InformationWorkers Compensation Information
Classifications and Cross-References
Expand Risk Mgt. and Multiline InformationRisk Mgt. and Multiline Information
Expand Risk Finance InformationRisk Finance Information
Expand Construction InformationConstruction Information
Expand Personal Lines InformationPersonal Lines Information
Expand Claims, Caselaw, LegalClaims, Caselaw, Legal
Expand Insurance IndustryInsurance Industry
Expand Glossary of Insurance & Risk Management TermsGlossary of Insurance & Risk Management Terms
Expand SearchSearch
Terms of Use
Privacy Statement
System Requirements
Support

Seven Tips on Mold Management Programs

November 2003

Concern over mold has resulted in a scurry to develop mold management programs that are often incomplete. Certain key areas should receive special attention: program objective, responsibility/accountability, response protocol, contract documents, subcontractor management, owner management, and administration.

by Jeff Slivka, ARM
New Day Underwriting Managers LLC

With all the hype and craziness about "toxic" mold over the past few years, organizations have rushed (in many cases were forced) to address the problem by developing "mold management programs." (I'm using a general term here that truly addresses water intrusion, moisture, mold plans, etc.) Whether these programs were created to truly educate and manage the risk for the organization or, more frequently, to purchase insurance, many of them lack the essentials of a quality program. Over the years I have seen a variety of programs: from mold policy statements (literally, a one-paragraph statement on the organization's policy toward water and mold) to a 75-page document complete with site-specific mold programs and extensive checklists to track issues. I'm not saying either is best, but there should be more continuity in the industry if the industry is going to manage this problem.

Seven areas are outlined below that should always be considered when developing a mold management program. I have addressed these areas since I frequently find these are the sections that most programs lack. This does not mean that these are the only areas that need to be addressed, but special attention should be given to these areas.

1. Program Objective

All programs have a goal, an objective. They may include reducing the organization's exposure to liability, reducing injury on a job site, decreasing cost by managing some certain risk, creating a competitive advantage, and so forth. Mold programs must also have an objective—what are they trying to accomplish? The next question is why are you trying to accomplish this? This is important for the main reason of communicating this to the entire organization. It's important for executive management to create or understand an objective, but it's even more important for that objective to then be communicated to the people that can prevent extensive damage.

2. Responsibility/Accountability

Many plans being developed seldom assign responsibility to specific job positions. When you think about it, there should be someone with designated responsibilities in every sector of the organization. Executive management has a role to budget for cost to implement the program, to communicate the importance of such a program, etc. The safety director may be responsible for developing the program, training, disseminating the information throughout the organization, etc. The project director may be responsible for subcontractor and owner management, contract language, education, etc. Field personnel are responsible for incident reports, response protocol, prevention measures, etc. This can be completed for all positions in the process.

3. Response Protocol

Now that you found it, what are you going to do with it? Who do you contact—inside the organization and outside the organization (owner, certified mold remediation contractor, who else)? Based on current remediation "guidelines," there are situations that can be handled quite simply by field personnel. Others may need to subcontract with a qualified firm to do the more extensive work. What qualifies a subcontractor to perform mold abatement? The following should be identified before the issue arises.

4. Contract Documents

Similar to the way many organizations contractually transfer typical environmental risk, contractors must consider transferring the exposure from mold. This could be accomplished several different ways. The most obvious is through indemnities broad enough to include environmental issues. To further strengthen the contract, preexisting contamination clauses and change in condition clauses speaking specifically to environmental conditions should be considered. These clauses are not exactly the same as, but are similar to, some contract provisions in the American Institute of Architect (AIA) A201 contract document. Specifically, the preexisting contamination clause will clearly state who is responsible for existing environmental issues, including mold. If issues exist prior to work that were not a result of the contractor's work, it should be the owner's responsibility, regardless if the contractor exacerbated the situation.

5. Subcontractor Management

This could be split into trade subcontractors and mold abatement subcontractors. For the trade subcontractors, it's the typical stuff—indemnity language, insurance requirements (and don't think just because a subcontractor has contractor's pollution liability coverage, they have coverage for mold as well), etc. When it comes to the mold abatement, contractors, and construction firms need to consider qualifications of the firm. Just because a firm has provided asbestos abatement services or has airborne contamination experience does not make it qualified to perform mold abatement. When hiring a firm to address the problem, hire a firm that could address the total problem: water. That's what we've all been saying for the last 3 years. So why wouldn't you want a firm with structural expertise, geotechnical and foundation expertise, and regulatory expertise in addition to airborne contaminant expertise?

Furthermore, has the subcontractor been certified to perform mold remediation? This may not carry much weight but is worth requesting the information. There are several organizations that offer such programs. One is the certified mold remediator (CMR) designation from the Indoor Air Quality Association (IAQA). The CMR has educational and experience requirements and requires a 3-hour test to be passed prior to the designation. To add to such designations, the subcontractor should be asked what "guidelines" they follow. There are numerous guidelines offered by the EPA, NYCDOH, OSHA, and several other organizations. However, as of November 2003, a consortium of trade associations have banned together to develop what they refer to as remediation "standards." The document incorporates information that currently exists and is referred to as IICRC Standard for Professional Mold Remediation S520.

Lastly, when you are considering trade subcontractors, have you requested their mold program be included with the prequalifications list? It is important to do so.

6. Owner Management

Some of the comments or questions I typically get when I suggest that contractors make owners aware of the mold issues is why should I do that? Why should I create a problem? Why should I educate them on the issue so they can sue me if a problem arises? I usually respond with a question: Who would you rather have educate your client, you or an attorney? Why not be proactive, address and manage the issue, and possibly prevent a frivolous lawsuit? If you're going to be sued, wouldn't you rather show that you did what you could to address and manage the problem rather than ignoring the issue and coming across as if you may have been hiding something? I'll answer that—yes!

Every organization that develops such a program may want to think about including owners in the training process and maybe even distributing the program to them. If you think about it, this could not only prevent future liability but also become a competitive advantage. You have the ability to educate the owner on the issues, show them how you excel in this area compared to the competition, and have the client's best interest at hand. I'd rather approach it that way than have to respond to questions on mold posed by the client. Be proactive!

Lastly, documentation is typical when it comes to operation and maintenance of systems. Do all checklists address the issues with water and mold? If the importance of proper operation and maintenance are going to be signed off by the owner, why not have them sign off on the checklist that explains the issues all around "toxic" mold?

7. Administration

I refer to this section as administration, but it really is execution. Many times what separates the good plans from the poor ones (I don't care if we are talking mold or business plans) is not the content but the execution! Most plans are similar, but if you cannot communicate and execute the vision, it will fail. As we have heard many times from many motivational experts, the will to succeed must be great, but the will to prepare must be even greater! My message here is put it to use: communicate, train, and execute!

Conclusion

Once again, these are only some areas that need to be incorporated into an effective water intrusion or mold management program. If I were to choose the most important, it would have to be the last: administration. You could have the best looking program, but if all it does is look great on somebody's shelf, what good is it?


Opinions expressed in Expert Commentary articles are those of the author and are not necessarily held by the author's employer or IRMI. Expert Commentary articles and other IRMI Online content do not purport to provide legal, accounting, or other professional advice or opinion. If such advice is needed, consult with your attorney, accountant, or other qualified adviser.

Advertisements
    
 
© 2000-2012 International Risk Management Institute, Inc. (IRMI). All rights reserved.