Skip Navigation Links.
Collapse IRMI OnlineIRMI Online
Expand How To Use IRMI OnlineHow To Use IRMI Online
My Paid Publications
Expand What's NewWhat's New
Expand DashboardsDashboards
Collapse Commercial Liability InformationCommercial Liability Information
Collapse Free Commercial Liability CommentaryFree Commercial Liability Commentary
Expand Additional Insured IssuesAdditional Insured Issues
Collapse EnvironmentalEnvironmental
Asbestos Damages Excluded under Property Policy (January 2012)
Insuring Completed Operations Pollution Risks (January 2012)
Emergency Response Costs in Pollution Liability Policies (August 2011)
Judgment Day Comes in Global Warming Litigation (February 2011)
Green Building Projects and Environmental Risk (January 2010)
No CGL Coverage for Chimney Repairs Due to Carbon Monoxide Leakage (January 2011)
CGL Pollution Exclusion Applies to Dust and Diesel Fumes (December 2010)
In a Year of Skepticism, Global Warming Is Still a Timely Topic (November 2010)
Mold from a Covered Concurrent Cause Still Excluded (November 2010)
Pollution Exclusion Found Inapplicable (May 2010)
An Update on Chinese Drywall Claims (April 2010)
CGL Policy Held To Cover Oil Spill Cleanup Costs (April 2010)
Mold Damage to Contractor's Nondefective Work Caused by Subcontractor May Be Covered under Prime Contractor's Umbrella Policy (January 2010)
CGL Pollution Exclusion Bars Coverage for Injury from Carbon Monoxide Released from Heater (December 2009)
Insurer and Environmental Consultant Have No Duty To Warn of Mold (July 2009)
No Coverage in Homeowner's Policy for Mold Damage from Water Pipe Leak (May 2009)
Construction Debris Is Excluded Pollutant (February 2009)
Pollution Legal Liability Market Update (July 2008)
"Damages" under a 1973 CGL Insurance Policy (April 2008)
"Suits" under a 1973 CGL Insurance Policy (February 2008)
Common Law Exceptions to the 1973 "Owned Property" Exclusion (January 2008)
Epoxy Fumes Excluded by CGL Insurance (November 2007)
Contractors Pollution Liability Update (October 2007)
Allocating Losses under a 1973 CGL (September 2007)
Pollution Exclusion Bars Coverage for Damage Caused by Dirt and Rocks (March 2007)
Pollution Exclusions in CGL Policy Bars Coverage for Carbon Monoxide Poisoning (February 2007)
Naturally Occurring Hazards: They Can Be "Hazardous" to Your Contractors Pollution Liability Coverage (January 2007)
Mold Is Not Covered as an Ensuing Loss of Leaking Water (January 2007)
Promoting Insurance-Based Solutions to Brownfield Redevelopment Challenges (November 2006)
Financing Environmental Loss with Environmental Insurance (October 2006)
Premium Instead of Prayer Needed for Mold Coverage (July 2006)
Mold Litigation: Expert Testimony Required to Prove Causation (April 2006)
Subrogation and Intervention in Construction Defect Case Involving Water and Mold (February 2006)
Environmental Insurance Helps Create Sustainable Development Out of "Brownfields" (December 2005)
Absolute Pollution Exclusion in Contractors Policy Does Not Bar Coverage for Toxic Fume Injuries (November 2005)
Manganism? (October 2005)
Environmental Insurance as a FASB Fix (August 2005)
Silica Claim Barred by Total Pollution Exclusion in CGL Policy (August 2005)
Broad Pollution Exclusion Is Ambiguous: Lead Covered by Policy (May 2005)
Silica—The Next Environmental Issue (April 2005)
Whether Mold Cleanup Costs Are Covered Depends on Causation (April 2005)
Homeowners Policy Unambiguously Excluded Coverage for Mold (October 2004)
Environmental Liability Buyouts: A Developing Option (August 2004)
Development of Environmental Risk Profiles for Construction Firms (July 2004)
Managing the Environmental Risk from Subcontractors (May 2004)
Seven Tips on Mold Management Programs (November 2003)
Environmental Due Diligence: The Information Is Everywhere! (May 2003)
The New Reality of Risk: Environmental Toxic Torts (May 2003)
Insured Fixed-Price Contracts and Environmental Cleanup (April 2003)
Managing Environmental Liabilities through Contracts (January 2003)
Environmental Insurance Changes the Game for Commercial Lenders (December 2002)
Environmental Risk in Retail: Exposures and Solutions (October 2002)
The Environmental Risks of Residential Construction (October 2002)
A Mold Prevention Program (July 2002)
Navigating the U.S. Environmental Liability Market (Part 2) (March 2002)
Navigating the U.S. Environmental Liability Market (Part 1) (March 2002)
The Pitfalls of Accepting Contaminated Fill (March 2002)
Mold: The Newest Environmental Hazard (September 2001)
Conducting Proper Environment Risk Assessments (July 2001)
Introduction to ISO 14001 (April 2001)
Brownfield Redevelopment: A Risk versus Reward Proposition (December 2000)
Colleges and Universities: Changing Your "School of Thought" When It Comes to Environmental Liability (October 2000)
Lenders and Environmental Liability (September 2000)
There's a Fungus Among Us (June 2000)
The U.S. Environmental Liability Insurance Market (May 2000)
Hidden Environmental Exposures of the Construction Industry (March 2000)
Expand Liability InsuranceLiability Insurance
Expand Commercial Property InformationCommercial Property Information
Expand Commercial Auto InformationCommercial Auto Information
Expand D&O, PL, E&O, EPLI InformationD&O, PL, E&O, EPLI Information
Expand Workers Compensation InformationWorkers Compensation Information
Classifications and Cross-References
Expand Risk Mgt. and Multiline InformationRisk Mgt. and Multiline Information
Expand Risk Finance InformationRisk Finance Information
Expand Construction InformationConstruction Information
Expand Personal Lines InformationPersonal Lines Information
Expand Claims, Caselaw, LegalClaims, Caselaw, Legal
Expand Insurance IndustryInsurance Industry
Expand Glossary of Insurance & Risk Management TermsGlossary of Insurance & Risk Management Terms
Expand SearchSearch
Terms of Use
Privacy Statement
System Requirements
Support

Conducting Proper Environmental Site Assessments

July 2001

Without a universal or federally mandated approach to ERAs, it is difficult to make proper, cost-effective decisions regarding suspect property. Jeff Slivka explains the most commonly used standards and offers guidelines.

by Jeff Slivka
New Day Underwriting Managers LLC

Whether it's the purchase or sale of a new parcel or parcels of property, the merger or acquisition of a company, or just a method of proactively managing environmental risk at existing properties, environmental site assessments (ESAs) play an integral role. ESAs, conducted properly, could save a company thousands, if not millions, of dollars in future problems or liability by simply identifying environmental conditions or contamination before it affects third parties. The operative phrase here is "conducted properly." If you are considering an ESA for various reasons, keep in mind there is no universal approach to the assessment process. This makes it a bit difficult to purchase such services.

Furthermore, there are no federal or state regulations that stipulate proper investigation procedures. However, several organizations, including the American Society for Testing Materials (ASTM), the American Society of Engineering Firms Practicing in the Geo-Sciences, and the National Groundwater Association, have developed guidelines for conducting environmental site assessments.

The Phase I

The most commonly used criterion is the ASTM standard (designation E1527). Designation E1527 identifies guidelines to perform the most widely known ESA, the Phase I. A Phase I ESA, performed in accordance with ASTM standards, should consist of the following:

  • An inspection of the property, including all structures, to identify possible sources of contamination, such as asbestos, electrical equipment containing polychlorinated biphenyls (PCBs) and hazardous substances or wastes.
  • An inspection for evidence of possible contamination from leaking storage tanks, old disposal areas, chemical containers, or drums.
  • An investigation of past spills or illegal disposal of hazardous substances, which can be evidenced by observing stained soil or stressed vegetation.
  • Interviews of individuals familiar with the property and its history to identify past events and uses that may have created conditions that could lead to environmental compliance problems.
  • Searches of available federal, state, county, and municipal records to identify possible sources of contamination on or near the site. Often, the firm conducting the Phase I will subcontract a company to perform a state and federal environmental database search, given specified distance radii around the subject property.
  • A search of title records for previous 50 years to identify past owners and uses of the property.
  • A review of available historical aerial photographs of the site to identify its past uses and any evidence of large-scale past waste disposal on the property.

In general, the goal of the Phase I is to identify signs that might indicate a need for further action or investigation. It is not a complete or all-encompassing study of the site; therefore, the potential for failing to detect contamination exists. The Phase I assessment, in many instances, can be performed by in-house personnel or by a firm specializing in environmental management services. The cost can range anywhere from $500 to a few thousand, depending on the scope of services requested.

The Phase II

As you might guess, the Phase II ESA is a continuation of the Phase I. The Phase II is an "intrusive" type assessment, which means sampling will be conducted in those areas identified as concerns. Additional subsurface investigations and sampling activities can include:

  • Subsurface soil and groundwater investigations and analyses on both the property and neighboring properties
  • Underground storage tank (UST) integrity testing and removal activities
  • Septic system, potable well water, and floor drain discharge point evaluations
  • Asbestos survey
  • PCBs, asbestos containing materials (ACMs), lead-based paint (LBP), and radon sampling
  • Mold/fungal investigations

The Phase II will assist with making business decisions about the property or contamination; however, it will not fully characterize the site or provide remedial solutions. It will identify what contaminants are present, the possible extent of contamination, and preliminary estimates for remediation. Costs for the Phase II vary greatly depending on the extent of the problem or contamination, the type of contaminants present, the materials on which the laboratory analyses must be conducted, etc. In general, Phase II assessments range from $5,000 to $25,000. However, in the event the site is an industrial facility or truly has complex issues, the cost could increase substantially.

The Phase III

The goal of the Phase III is simply to identify the most appropriate remedial solution to the problem and remediate it. During the Phase III, additional sampling analysis is conducted so the site is "characterized," which means the extent of contamination is known, and remedial action steps or corrective measures are determined and reported to the site owner. Lastly, the remedial action plan is implemented.

The chosen method of remediation is usually what drives the cost of the Phase III. In general, a Phase III could cost as little as $10,000 for minor excavation and disposal of non-hazardous soil (i.e., petroleum contaminated soil), to hundreds of thousands of dollars for surface or groundwater remediation. Specifically looking at soil removal, which is the most common remedial technique used, excavation and disposal of non-hazardous soil usually costs between $75-$100 per cubic yard, with some type of minimum costs to cover the remedial company's fees. If hazardous, soil excavation could run between $150-$400 per cubic yard. This also includes the cost for any treatment prior to disposal.

Environmental Risk Assessment Surveys

A bit different from the Phases I and II, but worth mentioning, is the environmental risk assessment survey or ERAS. The ERAS focuses not only on site conditions, but also on corporate philosophy, spill and contingency plans, and in-house training. The ERAS is a more proactive approach to managing environmental risk at a site or within a service organization. It is structured to evaluate existing standard operating procedures and facility programs for their effectiveness in reducing or eliminating both potential catastrophic and gradual pollution events. This is accomplished by assessing various areas of an operation.

Corporate Organization—Initially, the risk management consultant gathers information on the overall company philosophy. Does management appear to be proactive or reactive when addressing potential environmental exposures? Is management committed to implementing recommendations for reducing existing exposures? At the outset, management may indicate their commitment, but their attitude can change at budget time.

Environmental Setting—Who are the surrounding neighbors? What are the underlying soil and groundwater characteristics at the site? Where are surface water bodies located in relation to the site? Is the groundwater or surface water used for potable purposes? Upon answering these questions, resources may be allocated to protect environmentally sensitive areas.

Layout and History—What were some past environmental practices? Do facility operations take place along the property border or is there a buffer zone of several hundred acres? Depending on answers to these questions, the risk management consultant may uncover additional operational exposures.

Operations—How are materials such as ash or hazardous wastes stored and handled? Are acids properly contained to prevent a release to the surrounding environment? What about caustics? What types of pollution control equipment are utilized to reduce the amount of pollutants discharged to the air, water, and soil?

Training—Effective employee training can reduce or prevent the likelihood of a catastrophic event. With regard to the operations being performed, are the facility's training programs adequate?

Contingency Planning—In the event of a catastrophic event, are the plant personnel sufficiently prepared to respond? Efficient emergency response planning can help reduce the severity of a spill or release.

After completing the ERAS, the risk management consultant summarizes both the positive aspects of the company's operations, as well as those areas needing improvement, and recommends a program that continues positive initiatives and improves deficient areas. Most insurance companies offering environmental coverage provide ERAS to many of their clients to assist in the management of risk. Cost for the ERAS is in the range of $3,000 per location.

Conclusion

If you are in need of an ESA, it is best to site down with a qualified environmental consultant to determine the best approach to the situation. Many times, the above assessments can be combined, altered, etc., to provide the best information available to assist in any decisions that need to be made about the property.


References

  1. Miller, Lynne; Environmental Strategies Corp., "Environmental Risk Assessment," Society for Environmental Insurance Professionals Seminar (2001) New York City.
  2. Biddle, Chris; ECS, Inc. "Phase I Assessments and Their Limits" (2000).

Opinions expressed in Expert Commentary articles are those of the author and are not necessarily held by the author's employer or IRMI. Expert Commentary articles and other IRMI Online content do not purport to provide legal, accounting, or other professional advice or opinion. If such advice is needed, consult with your attorney, accountant, or other qualified adviser.

Advertisements
    
 
© 2000-2012 International Risk Management Institute, Inc. (IRMI). All rights reserved.