Design-Build Engineer Held Liable for Negligence
July 2001
A complex court decision holds that a developer
is entitled to recover its losses from the design-builder who employed the engineer
and constructed the failed projects.
by J.
Kent Holland, Jr.
Arch Insurance
Group Inc.
This article examines a complex case. Where a developer purchased land and
constructed hydroelectric facilities in reliance on an engineer's analysis of
the financial viability of proposed hydroelectric projects (including an assessment
of the energy to be generated by each project as well as the costs of construction),
it was entitled to recover its losses for the financially disastrous projects
from the design-builder that employed the engineer and constructed the projects.
One Man―Multiple Hats
In Hydro Investors, Inc. v Trafalgar Power, Inc.,
227 F3d 8 (2nd Cir 2000), an engineer by the name of Neal Dunlevy wore multiple
hats in his dealings with Trafalgar Power, Inc. (TPI), the entity that developed
the plants. Mr. Dunlevy was an engineer with Stetson-Harza and also the principal
and sole shareholder of Hydro-Investors, Inc. (HII). He approached TPI with
the suggestion that hydroelectric plants could be profitably developed in upstate
New York. He also suggested that TPI provide the capital to develop the plants
and that he, Dunlevy, would contribute the hydroelectric expertise either through
Stetson-Harza or HII. As a result of these discussions TPI retained Stetson-Harza
and HII to perform work associated with TPI's licensing and possible development
of six plants.
TPI entered into a contract with Dunlevy, through HII, calling for TPI to
provide the capital while HII would identify sites to be developed. Dunlevy's
activities for TPI were not limited to his work thought HII, but included a
role as chief engineer of the Water Resources Department at Stetson-Harza.
As part of its effort to obtain project financing, TPI asked Stetson-Harza
to prepare an analysis that could be used by potential lenders to evaluate whether
to invest in the projects. Included in this analysis was an assessment of projected
energy output.
The plants were constructed and, as stated by the court, "have proven to
be financial disasters," the primary problems being costs overruns and inadequate
energy production. At trial, a jury found Stetson-Harza and Dunlevy jointly
and severally liable in the amount of $7.6 million for damages arising out of
engineering malpractice.
Negligence―Proximate Cause of Damages
On appeal, Stetson-Harza and Dunlevy argued the jury's findings of engineering
malpractice were unsustainable. They asserted that TPI failed to prove that
the alleged acts of malpractice were the proximate cause of its injury, since
"negligent measurements of the flow and head at Forestport and Ogdensburg did
not cause those plants to generate less energy." Instead, they argued that it
was the low head of the river and surrounding terrain that caused the lower
energy output.
The appellate court rejected that reasoning as "specious" and concluded:
"It was not merely the failure of the plants, based on their physical characteristics,
to generate the desired amount of energy that caused TPI's damage. The legal
cause of TPI's injury was Dunlevy's failure to adequately convey the realities
of Ogdensburg and Forestport with a level of professional care that would have
allowed TPI to make its business decisions with respect to those sites based
on reasonably reliable technical information."
The court further stated that the physical traits of the sites served only
to provide the conditions precedent to the malpractice committed by Dunlevy.
To find "proximate cause" does not require that a jury determine that harm was
caused solely by one party, but rather requires only that the identified cause
be a substantial factor in bringing about the injury."
Having satisfied itself that the jury did not err in finding proximate cause
in the actions of Mr. Dunlevy, the court held, "Once the jury was convinced
that the minimal standard of professional care was not met in this case, the
proximate cause of TPI's injury could easily be construed to be the carelessness
of Dunlevy, and through the doctrine of respondeat superior, his employer, Stetson-Harza."
Economic Loss Rule
Stetson-Harza and Dunlevy argued on appeal that TPI should not have been
permitted to recover "lost revenues" since the "economic loss rule" applies
in New York. Under that rule, they argued that even if the evidence supported
a finding of professional malpractice, the damages awarded were of the type
that arise out of breach of contract rather than compensatory damages customarily
awarded in tort (negligence) actions.
The basic rule in New York is that where there is no property damage or personal
injury, pure economic losses may not be recovered in a negligence action. Only
a party in contract with another can seek such purely financial losses, and
the recovery is restricted to an action in contract.
In this case, the court concluded that the economic loss rule would not be
applied to bar the damages. It held, "While we recognize that some cases have
applied the economic loss rule to bar recovery where the only loss claimed is
economic in nature [ ], and still others have applied that rule to professional
malpractice cases [ ], the better course is to recognize that the rule allows
such recovery in the limited class of cases involving liability for the violation
of a professional duty. To hold otherwise would in effect bar recovery in many
types of malpractice cases."
Expert Testimony Required
On two of the other hydroelectric plants that were at issue, the trial court
dismissed TPI's causes of action for breach of contract and malpractice. TPI
cross-appealed that aspect of the trial court's judgment. The appellate court
affirmed the judgment because TPI had presented no expert evidence concerning
professional malpractice at the two sites and consequently the claims lacked
proof.
On the question of breach of contract, the court said that TPI's service
contracts with Stetson-Harza and Dunlevy did not include a contractual guarantee
that any particular site would produce a particular amount of energy. TPI failed
to prove any contract breach for those two facilities.
Conflicts of Interest
Dunlevy and HII argued that the trial court erred in allowing evidence of
alleged conflict of interest between Dunlevy's duties as an employee of Stetson-Harza
and as an owner of HII. They argued that this was highly prejudicial. The appellate
court stated that the trial court had broad discretion to admit such evidence.
Negligent Misrepresentation
Another interesting claim that TPI brought against Stetson-Harza and Dunlevy
was based on negligent misrepresentation. The trial court dismissed that claim,
and the appellate court affirmed the trial court's decision. The basis for the
claim was that Stetson-Harza and Dunlevy misrepresented the energy that would
be generated from the plants. The trial court found that the alleged misrepresentations
related to future events and were promissory in nature rather than factual,
and could not support a claim for negligent misrepresentations.
The appellate court agreed, holding, "In the present case, the negligent
misrepresentation claim fails because the energy output predictions were mere
promises of future output as opposed to present representations of existing
fact." But even if they had made representations sufficient to support a claim,
the court stated that TPI's claim would fail for lack of reliance on the alleged
representations since TPI possessed adequate knowledge that the project's financial
success was unlikely and, in any event, "should have known not to rely on the
energy output estimates."
Risk Management Points
There are several things to learn from this complex case. A design professional
may be subject to claims for consequential damages, including lost profits,
even in the absence of property damages or personal injury. State law varies
on whether the economic loss rule bars recovery for such damages.
Agreements between the parties should specifically address the risks and
liabilities to be accepted by each party. Waivers of consequential damages,
limitations of liability and similar clauses may be used to better define the
commercial relationship between the parties and enable the parties to evaluate
whether the risk-to-reward ratio is reasonable.
Caution should be exercised in permitting one individual to serve more than
one entity. The question of alleged conflict of interest was apparently raised
to the jury in this case and, according to Dunlevy and Stetson-Harza, caused
prejudice and harm to their position. It is also interesting to note that despite
the lack of performance guarantees, and the fact that the court did not allow
the cause of action for negligent misrepresentation to go forward, TPI was able
to recover its financial loss on the basis of professional malpractice. From
an insurance perspective, this may be a preferable result since a professional
liability policy for a design professional would have excluded recovery for
losses arising out of non-negligent breaches of warranties and guarantees.
Opinions expressed in Expert Commentary articles are those of the author and are
not necessarily held by the author’s employer or IRMI. This article does not purport
to provide legal, accounting, or other professional advice or opinion. If such advice
is needed, consult with your attorney, accountant, or other qualified adviser.